Guangdong Provincial Hazardous Waste Comprehensive Treatment Demonstration Center Phase II Project Incineration Engineering Adjustment Environmental Impact Public Participation Second Public Announcement
Publish time:
2020-05-22
In accordance with the requirements of the "Environmental Impact Assessment Law of the People's Republic of China", the "Measures for Public Participation in Environmental Impact Assessment" (Ministry Order No. 4), etc., it is necessary to carry out public participation in the environmental impact assessment of the incineration project adjustment of the Guangdong Provincial Hazardous Waste Comprehensive Treatment Demonstration Center Phase II Project (hereinafter referred to as "this adjustment project") to understand the public's attitude towards the construction of this adjustment project and their opinions and suggestions on environmental protection aspects of this adjustment project, and to accept public supervision.
Abstract:
In accordance with the requirements of the "Environmental Impact Assessment Law of the People's Republic of China", the "Public Participation in Environmental Impact Assessment Measures" (Ministry Order No. 4), etc., it is necessary to carry out public participation in the environmental impact assessment of the incineration project adjustment of the Guangdong Provincial Hazardous Waste Comprehensive Treatment Demonstration Center Phase II Project (hereinafter referred to as the "adjustment project") to understand the public's attitude towards the construction of the adjustment project and their opinions and suggestions on the environmental protection of the adjustment project, and to accept public supervision.
I. Project Name and Overview
(1) Project Name: Environmental Impact Report for the Adjustment of the Incineration Project of Guangdong Provincial Hazardous Waste Comprehensive Treatment Demonstration Center Phase II Project
(2) Construction Unit: Guangdong Anjiatai Environmental Protection Technology Co., Ltd.
(3) Construction Address: Shiwuliao Forest Farm, Lianghua Town, Huichong County, Huizhou City, Guangdong Province (Geographical location: East longitude 114°37′, North latitude 23°05′).
(4) Project Overview
(1) Existing Project and its Environmental Protection Status
The existing project was approved by the Guangdong Provincial Environmental Protection Department in September 2015 (Yuehuan Shen [2015] 445), but it has not yet been completed. The approved hazardous waste categories are: HW06 waste organic solvents, HW08 waste mineral oil, HW09 emulsion, HW11 distillation residue, HW12 paint waste, HW13 organic resin waste, HW16 photosensitive material waste, HW21 chromium-containing waste, HW35 waste alkali, HW48 non-ferrous metal smelting waste, HW49 other waste, and HW50 waste catalyst, totaling 12 categories. The daily disposal capacity is 100 tons, with an annual operation of 300 days, and an annual disposal capacity of 30,000 tons/year. The main project includes an incineration workshop, an outdoor disposal line (incineration system, waste heat recovery system, flue gas treatment system), a pretreatment workshop, and temporary storage projects including the No. 2 temporary storage warehouse, waste liquid storage tank area, and supporting wastewater treatment workshop, and a comprehensive building. According to the environmental impact assessment conclusion, after the treatment of various pollutants with corresponding treatment measures, they can all meet the emission standards and have little impact on the surrounding environment.
(2) Overview of the Construction Content of this Adjustment
This adjustment of the Phase II incineration project is an adjustment to the already approved environmental impact assessment. The specific content is as follows: The disposal capacity of the categories approved in the environmental impact assessment is adjusted, increasing the number of categories from 12 to 25 (the adjusted categories are as follows: HW02 pharmaceutical waste, HW03 waste drugs and medicines, HW04 pesticide waste, HW06 waste organic solvents, HW07 heat-treated cyanide-containing waste, HW08 waste mineral oil, HW09 emulsion, HW11 distillation residue, HW12 paint waste, HW13 organic resin waste, HW16 photosensitive material waste, HW17 surface treatment waste, HW18 incineration disposal residue, HW21 chromium-containing waste, HW33 inorganic cyanide waste, HW34 waste acid, HW35 waste alkali, HW37 organophosphorus compound waste, HW38 organic cyanide waste, HW39 phenol-containing waste, HW40 ether-containing waste, HW45 waste containing organic halides, HW48 non-ferrous metal smelting waste, HW49 other waste, HW50 waste catalyst, totaling 25 categories). The daily disposal capacity remains unchanged (100 tons/day), the annual operating time is adjusted from 300 days to 330 days, so the annual disposal capacity increases by 3,000 tons, and the total scale reaches 33,000 tons/year; newly added collection and storage of mercury-containing waste HW29 (900-023-29), cancellation of the construction of the Phase II wastewater treatment workshop and comprehensive building, other aspects remain unchanged. The total investment of this adjustment project is approximately 234.54 million yuan, of which the environmental protection investment is approximately 36.46 million yuan.
II. Potential Environmental Impacts and Environmental Protection Measures of the Construction Project
Waste gas: After the completion of this adjustment project, the main waste gases of the demonstration center include incineration flue gas generated by the incineration system, pretreatment workshop waste gas, hazardous waste temporary storage warehouse waste gas, waste gas generated from the main plant material pit, and storage tank area waste gas. The incineration system flue gas is treated by a comprehensive system of "waste heat boiler SNCR denitrification + rapid cooling acid removal desulfurization tower + Venturi tube (dry acid removal + activated carbon adsorption) + bag dust remover + alkali washing + flue gas heater", reaching the atmospheric pollutant emission limits of the "Standard for Pollution Control of Hazardous Waste Incineration" (GB18484-2001), and discharged into the atmosphere through a chimney. The pretreatment workshop waste gas is purified by "acid-base absorption + activated carbon adsorption" measures and discharged through the exhaust pipe. The waste gas from the temporary storage warehouse is purified by "alkali absorption + activated carbon adsorption" measures and discharged through the exhaust pipe. The waste gas from the main plant material pit is collected and incinerated in the rotary kiln incineration system. The waste gas from the storage tank area is purified by "gas collection pipe collection + spray absorption + demisting + activated carbon adsorption" measures and discharged through the exhaust pipe.
Wastewater: The wastewater generated after the completion of this adjustment project mainly includes production wastewater, domestic sewage, and initial rainwater, which is entrusted to the existing Phase I project wastewater treatment system according to an agreement. After treatment, it meets the stricter requirements of the "Water Quality for Industrial Water Reuse in Urban Wastewater Reuse" (GB/T19923-2005) and the "Water Quality for Urban Miscellaneous Water Reuse in Urban Wastewater Reuse" (GB/T18920-2002), and is all reused in the rapid cooling tower spray, alkali washing tower water replenishment, and greening processes of this adjustment project, and is not discharged externally.
Noise: After noise reduction, sound insulation, and noise reduction measures, the impact of noise on the surrounding environment can be reduced.
Solid waste: Solid waste generated during the production process of this adjustment project includes fly ash, slag, waste gas treatment waste (waste activated carbon, waste bags), waste resin replaced during the soft water preparation process, and office and domestic garbage. Slag and fly ash are disposed of in the Phase I safety landfill of the demonstration center according to the "transfer note" system. After stabilization and solidification, fly ash is finally sent to the safety landfill, and slag is directly landfilled safely. Waste gas treatment waste (waste activated carbon, waste bags) is returned to the Phase II incinerator for incineration. Office and domestic garbage is incinerated in the incinerator. After the above effective treatment and disposal, the impact of solid waste generated during operation on the environment is small.
Risk: This adjustment project has formulated environmental risk prevention measures for the entire process of hazardous waste treatment and disposal, covering hazardous waste collection and transportation, temporary storage, feeding, and incineration. The construction unit entrusts a professional hazardous waste transportation company to collect and transport the hazardous waste disposed of in this adjustment project to prevent the risk of hazardous waste collection and transportation; uses sealed barrels to temporarily store waste, which can prevent the risk of hazardous waste temporary storage; establishes a professional laboratory to study compatibility plans, which can prevent the risk of hazardous waste compatibility; uses semi-automatic feeding facilities, and all operators have undergone on-the-job training, which can prevent the risk of hazardous waste feeding; the incineration equipment is equipped with a professional emergency system and a linkage reaction mechanism, and high-specification equipment designed with refractory materials is selected. Through comprehensive analysis, after taking corresponding preventive and emergency measures, the environmental risk level of this adjustment project is acceptable.
III. Conclusion
The construction unit must strictly abide by the "three simultaneous" regulations, implement the environmental protection measures proposed in this report, ensure the normal operation of environmental protection facilities, and strengthen environmental management and monitoring systems. From an environmental perspective, the project construction is feasible.
IV. Network connection of the draft environmental impact report for the construction project and methods and channels for reviewing the paper report
Network connection: http://t.cn/A62UqGEI
Paper report: Contact the construction unit. Contact information can be found in Section X.
V. Scope and main matters of soliciting public opinions
(1) Scope: Units and individuals directly or indirectly affected by this adjustment project, as well as units and individuals concerned about the project construction.
(2) Main matters:
1. Are you aware of the construction of this adjustment project?
2. What role do you think this adjustment project plays in the treatment of hazardous waste around it?
3. What do you think is the impact of this adjustment project on the local social and economic conditions?
4. What do you think are the main environmental impacts of this adjustment project during its operation?
5. Do you think that after this adjustment project adopts corresponding environmental protection measures, it can reduce the impact of the pollution generated on the surrounding environment?
6. What is your attitude towards the construction of this adjustment project?
7. What suggestions do you have for this adjustment project in terms of environmental protection?
VI. Network connection of the public opinion form
Public opinion form URL: http://t.cn/A62UqVFE
VII. Methods and channels for submitting public opinions
The public can submit public opinions through letters, faxes, emails, etc.
VIII. Start and end time for public opinion submission
Public notice for 10 working days from today.
IX. Name of the environmental impact report preparation unit : Guangdong Debao Environmental Technology Research Co., Ltd.
X. Name and contact information of the construction unit
Construction unit: Guangdong Anjiatai Environmental Protection Technology Co., Ltd.
Contact person: Ye Gong Contact number: 0752-8964100-8702 Email: Huizhou.Project@veolia-es.cn
Mailing address: Shiwuliao Forest Farm, Lianghua Town, Huichong County, Huizhou City, Guangdong Province
Guangdong Anjiatai Environmental Protection Technology Co., Ltd.
May 22, 2020
Tags:
Recommended news
Share to