Guangdong Provincial Hazardous Waste Comprehensive Treatment Demonstration Center Phase II Project Incineration Engineering Adjustment Environmental Impact Assessment First Public Announcement


Publish time:

2020-03-02

In accordance with the relevant provisions of the "Public Participation in Environmental Impact Assessment" (Ministry of Ecology and Environment Order No. 4), public participation information on the environmental impact assessment of the adjustment to the incineration project of the second phase of the Guangdong Provincial Hazardous Waste Comprehensive Treatment Demonstration Center (hereinafter referred to as "the adjustment project") needs to be publicized. This is to understand the public's attitude towards the adjustment project and their opinions and suggestions on environmental protection aspects of the adjustment project, and to accept public supervision. If you have any opinions or suggestions on this adjustment project, please participate in the public survey. Thank you for your support.

Guangdong Provincial Hazardous Waste Comprehensive Treatment Demonstration Center Phase II Project Incineration Engineering Adjustment Environmental Impact Assessment First Public Announcement

Abstract:

  In accordance with the relevant provisions of the "Public Participation Measures for Environmental Impact Assessment" (Ministry of Ecology and Environment Order No. 4), public participation information on the environmental impact assessment of the adjustment to the incineration project of the Phase II Guangdong Provincial Hazardous Waste Comprehensive Treatment Demonstration Center (hereinafter referred to as "the adjustment project") needs to be publicized. This is to understand the public's attitude towards the adjustment project and their opinions and suggestions on environmental protection aspects of the adjustment project, and to accept public supervision. If you have any opinions or suggestions on this adjustment project, please participate in the public survey. Thank you for your support.

  I. Project Overview

   Project Name : Environmental Impact Report for the Adjustment of the Incineration Project of Phase II Guangdong Provincial Hazardous Waste Comprehensive Treatment Demonstration Center

   Construction Unit : Guangdong Anjiatai Environmental Protection Technology Co., Ltd.

   Construction Location : Shiwuliao Forest Farm, Lianghua Town, Huichong County, Huizhou City, Guangdong Province (Geographical location: East longitude 114°37′, North latitude 23°05′)

  Project overview is as follows:

  (1) Existing project and its environmental protection situation

  The existing project was approved by the Guangdong Provincial Environmental Protection Department in September 2015 (Yuehuan Shen [2015] 445), but has not yet been constructed. The approved hazardous waste categories are: HW06 waste organic solvents, HW08 waste mineral oil, HW09 emulsion, HW11 distillation residue, HW12 paint waste, HW13 organic resin waste, HW16 photosensitive material waste, HW21 chromium-containing waste, HW35 waste alkali, HW48 non-ferrous metal smelting waste, HW49 other waste, and HW50 waste catalyst, totaling 12 categories. The daily disposal capacity is 100t, with an annual operation of 300 days, and an annual disposal capacity of 30000t/a. The main project includes an incineration workshop, an outdoor disposal line (incineration system, waste heat recovery system, flue gas treatment system), a pretreatment workshop, and temporary storage projects including the No. 2 temporary storage warehouse, waste liquid storage tank area, and supporting wastewater treatment workshop, and a comprehensive building. According to the environmental impact assessment conclusion, after the treatment of various pollutants with corresponding measures, they can all meet the emission standards and have little impact on the surrounding environment.

  (2) Overview of this construction content

  This adjustment to the Phase II incineration project compared to the already approved environmental impact assessment adjustment: The adjustment to the environmental impact assessment has adjusted the approved category disposal capacity, increasing the categories from 12 to 25, the daily disposal capacity remains unchanged (100t/d), the annual operating time is adjusted from 300 days to 330 days, so the annual disposal capacity increases by 3000t, with a total scale of 33000t/a; newly added collection and storage of mercury-containing waste HW29 (900-023-29), cancellation of the construction of the two supporting wastewater treatment workshops and comprehensive buildings, other aspects remain unchanged.

  II. Name and Contact Information of the Construction Unit

  Construction Unit: Guangdong Anjiatai Environmental Protection Technology Co., Ltd.

  Contact Person: Mr. Chu Contact Number: 0752-8964100-8704 Email: Huizhou.Project@veolia-es.cn

  Mailing Address: Shiwuliao Forest Farm, Lianghua Town, Huichong County, Huizhou City, Guangdong Province

   III. Name of the Environmental Impact Report Compilation Unit : Guangdong Debao Environmental Technology Research Co., Ltd.

  IV. Network Link to the Public Opinion Form

  https://pan.baidu.com/disk/home?fr=ibaidu#/all?path=%2F&vmode=list

  V. Methods and Channels for Submitting Public Opinion Forms

  The public can submit public opinion forms by mail, email, or directly to the company. The mailing address is shown above.

 

Guangdong Anjiatai Environmental Protection Technology Co., Ltd.

March 2, 2020

Tags: