RFQ for 3T clamp rotary forklift
Publish time:
2023-02-17
I. Price Inquiry / Quotation Document Request / Submission Method:
1 Contact Person / Supervisor
Contact Person: ; Email: 。
Tel Phone: 0752-8964100-8508 ; Fax Number: ______ __。
Supervisor: Xu Chunhua __; Email: chunhua.xu@veolia-es.cn 。
Tel Phone: 0752-8964100-8601 ; Fax Number: ______________。
2 Address: Shiwuliao, Lianghua Town, Huichong County, Huizhou City, Guangdong Province (Postcode: 516323 ).
3 Quotation document submission deadline: 2023 Year 2 Month 24 Day 17 Time.
4 The quotation document must be sealed and delivered, with the bidder's seal affixed to the seal.
5 Composition of quotation documents (see attachment for detailed quotation document format 1 )
II. Quotation Content and Requirements:
1 Equipment quotation table (including spare parts and special tools quotation list);
2 Technical report of quoted goods ( Configuration, technical parameters, system solutions, etc. );
3 After-sales service table;
4 Typical customers;
5 Quotation qualification documents (unit basic information: copy of business license, copy of organization code certificate, brief introduction of unit basic information, manufacturer's sales authorization certificate, quality assurance system 9001 Certification documents (if any), production product qualification certificates (if any), etc.).
III. Summary of Commercial Terms:
1 Delivery location: Shiwuliao, Lianghua Town, Huichong County, Huizhou City, Guangdong Province Huizhou Dongjiang Veolia Environmental Service Co., Ltd..
2 Quality Assurance:
The supplied goods must be brand new, genuine, and fully comply with national quality standards. The product packaging must have complete and valid information from the manufacturer, specifications, model numbers, etc., otherwise the buyer may consider it " Three No ” " products and refuse to accept them.
3 Changes:
Within the validity period of the quotation, if the purchased goods cannot be provided due to reasons such as supplier's discontinuation of production, the seller must supply new goods of the same or higher grade, and the prices of the goods (unit price and total price) shall not be increased.
4 Acceptance Method:
( 1 )Acceptance standards, methods and deadline for raising objections: Acceptance shall be carried out in accordance with the quality requirements and technical standards agreed upon by both parties. If the acceptance shows that the quality, specifications or performance of the goods fail to meet the standards stipulated in this contract in any material aspect, the supplier shall, after written notification by the purchaser and verification by the supplier, replace the purchaser with other qualified goods at the supplier's own expense;
( 2 )Installation and commissioning of complete sets of equipment: The supplier's engineer is responsible and will not be charged separately. The purchaser shall inform the supplier of the installation and commissioning by email, telephone, fax or other means. After the supplier confirms that the end user has the installation conditions, the supplier shall assign an engineer to arrive at the contract delivery location within one week for installation and commissioning.
( 3 )All the supplied goods have arrived, installation and technical acceptance have been completed, technical indicators have been accepted, an acceptance report has been issued, and the user personnel training has been completed (at least 4 persons, requiring signature acknowledgment), the acceptance report shall take effect after being signed and acknowledged by both the buyer and seller and the installer (when it is a third party).
5 Payment Method:
( 1 ) After the supply contract comes into effect, the buyer shall pay 30% contract amount as a deposit;
( 2 ) After the buyer issues a written production notice 30 calendar days, the equipment will be manufactured and delivered to the delivery location;
( 3 ) After the equipment installation, commissioning, trial operation acceptance is qualified and the acceptance report takes effect _15 _ working days, the buyer shall pay _70% contract amount;
6 After-sales service: In accordance with national and industry standards, the seller provides the best after-sales service commitment, including warranty period, scope, response timeliness, spare parts supply, etc.
IV. Quotation and Quotation Document Preparation Requirements:
1 The quotation includes product transportation, installation guidance, commissioning, service, and taxes;
2 Each page of the quotation document must be stamped with the bidder's seal, and the document should be stamped with a continuous seal;
3 Two copies of the quotation document.
V. Definition of Invalid Quotation Documents:
The quotation document is invalid if any of the following situations occur:
1 The bidder is found to have illegal or irregular behavior that affects the fairness of the procurement process;
2 Due to force majeure, the buyer's procurement plan is cancelled.
3 The content of the quotation document does not meet the requirements of Clause IV of this quotation document.
VI. Quotation Document Review:
The review team organized by the buyer will follow the principles of " Fair, just, scientific, and merit-based ” The principle of reviewing the quotation documents provided by the seller, comprehensively considering factors such as technical indicators, price, and after-sales service commitments, negotiating with pre-selected bidders, and determining the contract awardee.
VII. Signing Notification:
1 The inquirer may increase or decrease the quantity, technical standards, and scope of procurement of goods within a certain range before signing the supply contract;
2 After all clauses of the supply contract are agreed upon by both parties, the inquirer will arrange the signing.
VIII. Modification and Clarification of the Inquiry Document:
1 Deadline for submission of quotation documents 3 working days before , The inquirer may modify or supplement the relevant content of the document, and send the scanned copy of the modified and supplemented content with a seal to the bidder via email;
2 Bidders should carefully read this inquiry document. If there are any questions, they should be sent via email to the contact person and supervisor specified in this inquiry document 3 working days before the deadline for submission of quotation documents (questions sent only to the contact person or supervisor are invalid, and the inquirer will not respond), and inform the contact person by phone. The inquirer will reply via email within 1 working days after receiving the email or phone call (whichever comes later).
IX. Ordering Scope, Technical Performance and Parameters ( See Attachment 1 )
X. Number of Attachments:
1 Attachment 1 (Technical Documents);
2 Attachment 2 (Quotation Document Format).