2024 Huizhou Wei Air Conditioning Maintenance Inquiry Document


Publish time:

2024-05-27

2024 Huizhou Wei Air Conditioning Maintenance Inquiry Document

2024 Huizhou Weidong Air Conditioning Maintenance Inquiry Document

  

I. Procurement Project: 2024 Year Factory Air Conditioning Maintenance

II. Maintenance List and Air Conditioning Accessories List

1. Factory Air Conditioning Maintenance List:

Factory one-to-one split air conditioners total 88 units, ceiling units 5 units, central air conditioning system main unit using Midea air-cooled heat pump module units 3 units, terminal fan coil units 26 units; The maintenance period repair scope includes: free labor costs, including parts within the unit price 100 yuan (excluding copper pipes, air conditioner disassembly and installation, and refrigerant) 。

2. Air Conditioning Maintenance Accessories List: Accessories may be for 1 to 5 HP air conditioners.

III. Maintenance Content

Part 1: PFS Maintenance Work Content

A             Preparation and inspection before startup during operation Before operation in the cooling season, the following checks and preparations must be carried out to ensure reliable, safe, and efficient operation of the unit:

1. Check refrigerant level and oil level;

2. Check oil sump, oil heater, and oil temperature;

3. Check and test all operating and safety control functions;

4. Review operating procedures with operators and check unit history;

5. Check the operation of the starter;

6. Cooperate to check the operation of the water system (including chilled water pumps, water flow switches, valves, etc.);

7. Check and adjust the set values of the microcomputer control center;

8. Start the unit, check the operation of the entire system, and record the unit operating parameters;

9. Analyze and handle unit problems based on operating records;

10. Provide maintenance report.

B             Check the unit during operation, regularly (every quarter ) perform the following checks to ensure that the unit operates efficiently and reliably throughout the cooling season:

1. Check the chiller and adjust the safety control device;

2. Check the operation of the control device;

3. Check oil level and refrigerant level;

4. Check the lubrication system;

5. Check the return oil system;

6. Check the operation of the motor and starter;

7. Record the operating status parameters, analyze and confirm that the unit is operating normally, and repair the unit if necessary;

8. Record and report required spare parts.

C             One two times equipment shutdown inspection and preventive maintenance

During the shutdown period, the following checks are carried out once a year to correctly evaluate the status of the equipment and prepare for operation in the next cooling season:

1. Check the following items of the compressor-motor assembly and complete the tasks of preventive maintenance:

◆ Record voltage;

◆ Measure and record the insulation resistance of the motor windings with a megohmmeter;

◆ Check and confirm the positioning of the open motor drive device;

◆ Check the sealing condition;

◆ Check the operation of the slide valve and make necessary adjustments.

2. Check the following items of the compressor lubrication oil system:

◆ Replace lubricating oil, oil filter, and dryer filter as needed;

◆ Check the heater and thermostat;

◆ Check all other lubricating oil system components, including oil coolers, oil filters, and solenoid valves, etc.;

3. Perform the following operations to check the motor starter:

◆ Perform diagnostic check procedures;

◆ Clean or replace the contactor as recommended;

◆ Check the connecting mechanism;

◆ Check all terminals and tighten;

◆ Check the overload device and take an oil sample for calibration;

◆ Clean the oil filter and replace it if necessary;

◆ No-load operation starter (or before starting); check status indicator lights.

4. Check the control panel to determine the following:

◆ Perform diagnostic check procedures;

◆ Check the safe shutdown operation status;

◆ Check all terminals and tighten;

◆ Check the accuracy of the displayed data and the set values.

5. Check the following items of the condenser and evaporator:

◆ Check the water flow rate;

◆ Check the control of the water flow switch;

◆ Analyze the heat exchange effect based on the operating record parameters, and suggest water treatment;

◆ If necessary, remove the end cover and replace the gasket.

6. Check the following items of the system:

◆ Conduct a leak check, locate the leak, and repair it;

◆ Replenish refrigerant as required;

◆ Record the status of the sight glass;

◆ Check the refrigeration cycle and confirm that it is in a normal balance state;

7. Others:

◆ Following the inspection and maintenance procedures, repair the detached insulation layer;

◆ Communicate with the operators.

Part Two               Water Treatment Work Content

A. Purpose of Water Treatment

The reuse of chilled and cooling water in air conditioners saves water and electricity, which is an important part of saving resources and reducing operating costs. However, some chemical reactions or biological processes that occur during the reuse of water circulation have a corrosive effect on metal pipes and reduce the heat exchange efficiency of condensers and evaporators, so water treatment is necessary.

B. Cleaning and Pre-filming Scheme for Central Air Conditioning Chilled Water Circulation System

1) Chemical Cleaning of Chilled Water System: The contractor will add bactericides, algicides, and cleaning agents to the chilled and cooling systems according to different conditions. The system will run for 24 hours, and water will be replaced and discharged until the turbidity is <35ppm.

2) Rust Removal Cleaning of Chilled Water System

After the above treatment, rust removal cleaning is carried out. Chemical rust removal cleaning agents, dispersants, and corrosion inhibitors are added to remove sludge, loose rust, iron scale, and scale from the circulation system pipe walls and heat exchangers. This process takes about 24 hours of continuous operation, during which the pH value, turbidity, total iron, etc., are monitored. Based on the monitoring results, medication is continuously added. When the above items show a downward trend, stop adding medication and proceed to the complete discharge stage. Completely drain the chilled water from the system's lowest point, open the Y-type filter, remove the filter screen debris, discharge the turbid water, and replace it with fresh tap water. The cleaning stage is complete.

3) Passivation and Pre-filming of Chilled Water System

When the water quality is close to the original water color, passivation agent and (copper, carbon steel) pre-film composite agent are added: using the improved WP-4 formula, adding corrosion inhibitors and corrosion inhibitors for closed-loop systems. The main purpose of this step is to strengthen the treatment of the inner wall metal surface of the cleaned system, forming a thin protective film on the inner wall of the metal, reducing the corrosion rate during future operation and reducing the formation of iron scale, scale, and rust nodules. Discharge part of the pre-film liquid and end the pre-film. Proceed to the normal operation and maintenance stage.

C. Daily Maintenance Plan

1. Conduct a major system cleaning two times per year to remove accumulated sludge, oil, rust, and other deposits.

2. Clean the expansion tank two times per year.

3 times per year to remove debris. two disassemble the Y-type filter

4. For the chilled water system, take water samples every quarter to determine the pH value, monitor for abnormal leaks, and replenish corrosion inhibitors in a timely manner.

5. Based on the bacteria count and sludge amount test results, add bactericides and algicides in a timely manner to control the growth of bacteria and algae.

6.            Add corrosion inhibitors every quarter.

7. During the winter shutdown period, add a wet preservation agent to prevent static water corrosion.

Service Method:

I. Central Air Conditioning

1. Maintenance Work Content Requirements, Every quarter time, technical personnel are dispatched to conduct inspections and repairs of the listed equipment;

2. Conduct pre-season preparation and inspection once a year for both the cooling and heating seasons;

3, Conduct equipment shutdown inspection and preventive maintenance once a year for both the cooling and heating seasons.

II. Split Air Conditioner Maintenance:

1. Every year 4 ~May to the outdoor unit for in-depth cleaning and maintenance 1 times : outdoor unit condenser and cooling fan dust removal and descaling, then use high-pressure water gun to clean thoroughly 、 Check if the refrigerant is missing, if the copper pipe insulation is intact, and if the installation is stable 。

2. Every year in April ~May perform in-depth cleaning and maintenance of the indoor unit once : Indoor unit evaporator, circulating fan impeller, filter screen, indoor unit casing and outlet Sampling Clean with a high-pressure water gun and collect wastewater properly.

3. Annually on January 1st, indoor and outdoor units Equipment shutdown inspection and preventive maintenance 。

Four, Fault response time

1. Supplier Received Our company After the phone notification, it must arrive within 6 hours Our company Office building for maintenance;

2. If the air conditioner does not need to replace parts, Supplier It needs to restore the air conditioner to normal operation within 4 hours after arrival;

3. If parts need to be replaced, the air conditioner should be restored to normal operation within one working day in principle. If large-scale manufacturer-customized parts are involved, the air conditioner should be restored to normal operation within three days after the parts arrive from the manufacturer.

Five, Quotation Document Requirements:

1) The quotation document prepared by the offeror should include the following content:

1. Quotation Details Table ( Format See Attachment 1) ;

2. Quotation goods technical situation report ( Brand 、 Specifications, technical parameters );

3, After-sales service Content ;

4, Typical customers;

2) Quotation and quotation document preparation requirements:

1、 The quotation includes product transportation, guidance installation, debugging, Metrology verification, Service, taxes, etc.;

2、 Quotation document Must Stamp with a continuous seal ;

3, The quotation document must be sealed and delivered, and the sealed part must be stamped with the offeror's seal.

Six, Business requirements:

1. Contract maintenance period :

2. Transportation method and freight burden : Supplier Responsible Before arrival All costs related to transportation.

3, Delivery location: Huizhou Dongjiang Veolia Environmental Service Co., Ltd., Address: Nan Keng, Shiwuliao, Lianghua Town, Huicheng District, Huizhou City

4, Payment method:

1) 30% advance payment within 30 days after the contract is signed; 40% maintenance fee within 30 days of the contract expiration for 6 months; 30% maintenance fee within 30 days after the contract expiration.

2) For each progress payment, Party B shall provide the corresponding amount 13 '% VAT special invoice and payment application form, Party A' Pay within 30 days 。

3) The parts cost will be settled and paid according to the actual order quantity. 。

 

 

 

Complete version of the inquiry document

 