Routine maintenance and annual maintenance service for the HuiZhou Dongjiang Veolia air compressor
Publish time:
2023-11-13
Air Compressor Maintenance and Quotation Document
1. Project Overview
Huizhou Dongjiang Veolia Environmental Service Co., Ltd. currently uses 6 Atlas Copc brand air compressors. The models are as follows: Two GA132W-7.5, One GA75VSDAP13, one GA75+AP-7.5, and two GA18. These six air compressors require regular maintenance, consumable replacement, routine inspections, and repairs according to the manufacturer's instructions.
2. Work Scope
2.1 Air Compressor Regular Maintenance Content
l Regular air compressor oil changes
l Regular cleaning of the air compressor exterior and filters
l Regular inspection and testing of the safety valves used on the air compressor
2.2 Air Compressor Consumable Replacement (including but not limited to):
l Regular replacement of oil filter elements according to the manufacturer's maintenance manual
l Regular replacement of air filter elements according to the manufacturer's maintenance manual
l Regular replacement of oil-gas separators according to the manufacturer's maintenance manual
2.3 Regular Inspection and Maintenance
l Check the entire machine for water, air, and oil leaks and address them;
l Check if the automatic drainers of the air compressor, air tank, dryer, and filters are draining normally, and check if the drainage is normal;
l Check the machine's operating environment, such as ambient temperature, ventilation and heat dissipation, dust and impurities, etc. If necessary, propose improvement plans;
l Check and record the exhaust pressure;
l Check the exhaust temperature and the head outlet temperature; check the temperature control valve if necessary; check the temperature controller;
l Check the oil level and quality; add or replace if necessary;
l Check the machine's operating hours, the usage time of each consumable, and the pressure difference; propose the consumable replacement time and advise the client to prepare consumables in advance;
l Inspect and clean the air filter; replace if necessary;
l Inspect the cooler and clean the air-cooled cooler; clean if necessary;
l Check and record the cooling water pressure and inlet/outlet temperatures;
l Check the oil circulation system; check the safety valve and clean the cooler;
l Check the air circulation system;
l Regular inspection of the coupling or belt;
l Check the compressor body and motor for operating noise and vibration; if abnormal, provide a written solution and suggestions;
l Test and record the motor surface temperature and current;
l Check the power voltage;
l Check each component in the electrical control box;
l Check the compressor loading and unloading and record the loading and unloading pressure;
l Clean and organize the entire machine;
l Check and record the working pressure and evaporation pressure of the air dryer;
l Check the exhaust system, filter system, and oil-water separation system of the drying air tank;
l Based on the test results, formulate a corresponding solution, issue a specific work order record, have the client's on-site person in charge sign, and provide corresponding explanations.
3. Work Interface Division
3.1 Client Responsibilities :
l Provide the water and electricity required for maintenance or repair;
l Provide the forklift required for construction;
l Provide the coordination and management work required for this project.
3.2 Contractor's Work Interface Including but not limited to:
l Provide all main and auxiliary materials required for this work;
l Provide a material list before maintenance;
l Provide all personnel required for the work;
l Provide workers' PPE and uniform work clothes;
l Provide all construction tools and equipment except for forklifts;
l Responsible for 5S management of the work area and ensure the area is clean;
3.3 Other matters not covered herein shall be jointly negotiated by both parties 。
4. Technical and Quality Requirements
4.1 Quality Requirements:
l All consumables, oils, and accessories used by the supplier are Atlas Copco company's dedicated products for various models of air compressors
l Safety valves used with air compressors need to be regularly inspected according to special equipment requirements
l After the consumables and accessories are replaced, a start-up test must be performed to ensure that the equipment is running normally and without leaks
l After equipment repair, a performance test must be performed on the equipment to ensure that the equipment is running normally before
4.2 Standards:
l GB50029 Compressed Air Station Design Standard
l GB/T13466 General Rules for Economical Operation of AC Electric Drive Fans (Pumps, Air Compressors) Systems
l GB/T16665 Energy Monitoring Method for Air Compressor Units and Air Supply Systems
5. Tools and Equipment Requirements
The maintenance party shall provide all construction tools and equipment required for this work.
6. Safety Requirements
6.1 Implement Huizhou Dongjiang Veolia Environmental Service Co., Ltd.'s health, safety, and environmental management system, regulations, and project safety management regulations;
6.2 A project health, safety, and environmental management system must be established and submitted to the client before entering the site for work;
A dedicated safety officer shall be assigned to the construction site for real-time monitoring and management, and to submit safety reports and materials as required by the client on time.
At the pre-shift meeting, the foreman shall conduct safety technical briefings on the construction project and keep records of the briefing content.
The construction team must actively participate in safety meetings and training organized by the client (such as project safety weekly meetings, monthly safety meetings).
When conducting hazardous operations, the work permit system must be implemented (obtaining a hazardous operation permit, such as for hot work, high-altitude operations, etc.), and risk analysis and appropriate protective measures must be taken.
Before starting construction work, the foreman shall inspect personnel, equipment, tools, safety protective supplies, and the construction safety plan.
6.8 The construction team's safety supervision and safety officers should conduct self-inspections daily, rectify any identified hazards, and keep relevant records.
6.9 Workers should be familiar with and proficient in first aid, fire fighting, and escape safety knowledge and skills.
7. Change
Changes arising during maintenance shall be confirmed by the client in terms of workload, with settlement of fees after project completion.
7.2 Change fees shall be calculated based on the contractually agreed labor, equipment, and material consumption rates.
8. Completion Confirmation
8.1 After completion of the work, the project must pass the client's quality inspection and completion confirmation before it can be deemed completed. The client has the right to conduct a comprehensive assessment of the contractor's construction progress, quality, and HSE, and has the right to take economic measures for any non-compliant items. Before completion, the contractor is responsible for construction according to design changes, rectification as required, and product protection. The contractor shall provide quality follow-up services during the warranty period.
9. Quotation Document
9.1 General Requirements
1 The quoting party should prepare the quotation document according to the requirements of this quotation document, responding to the inquiry document item by item and clause by clause. The order and numbering should be consistent with the inquiry document. Explanatory or descriptive text can be added.
2 Any differences between the quotation document and the inquiry document, even if very small, should be summarized in the "Difference Table". The inquiring party will use this as a basis for deciding whether to accept or reject the quotation during the evaluation process. Any content not explained in the quotation document or not covered in the explanation will be deemed accepted by the quoting party and will become part of the contract signed by both parties. No additional conditions may be proposed for any reason.
3 The quotation document confirmed by the quoting party is legally binding. Any oral agreement with any individual from the inquiring party shall not affect any clauses or content of the quotation document.
9.2 Quoting Party Suggestions
The quoting party should respond to the inquiry document and provide a quotation. In addition, it can also provide supplementary suggestions or explanations, proposing more reasonable suggestions than those required in the inquiry document, listed in "Other Issues Requiring Explanation by the Quoting Party." It should also explain the impact on technical conditions, price, construction, etc. Any preferential conditions should also be stated in the quotation document, and the inquiring party will carefully consider them during the evaluation.
9.3 Number of Copies and Signature of Quotation Document
1 One original and two copies of the quotation document are required. The quotation document should be marked with "Original" and "Copy" respectively. In case of discrepancies between the copy and the original, the original shall prevail.
2 The quotation document should be signed by the legal representative (or authorized agent) of the quoting party and stamped with the company seal.
3 The quotation document will not be returned regardless of whether it is finally adopted or not.
9.4 Quotation
1 The quoting party should carefully fill in the engineering quotation form in accordance with the format of "Attachment 2" of the inquiry document. The quotation form includes two parts: total contract price and itemized quotation.
This quotation is a lump-sum turnkey price. The quoting party should prepare the budget and quotation based on the inquiry document, engineering technical specifications, and site survey of this project. The quotation will not be adjusted after submission (any changes in the engineering quantity that occur during the project implementation are included in the total contract price).
2 The quoting party shall quote entirely in RMB. For all clauses in this inquiry document that involve quotations, the quoting party should include them in the quotation. The inquiring party considers the quoting party's quotation to be the result of a comprehensive calculation of various costs and taxes (the tax rate should be clearly stated), and this quotation is a fixed price.
3 The quoting party may adjust the total quotation before the quotation deadline. The adjustment document must be signed by the legal representative (or authorized agent) and stamped with the company seal, and submitted as a supplementary material to the quotation document (must be submitted sealed as required).
9.5 Submission of Quotation Document
1 Sealing and Marking of Quotation Document
The quotation document should be correctly marked as "Original" or "Copy". The cover must indicate the quotation project and the name of the quoting party.
2 Quotation Deadline and Location: Submit/courier to "Huizhou Dongjiang Veolia Environmental Service Co., Ltd. Purchasing Department Li Tingmin 13652778560" before November 17, 2023. The quotation document must be submitted to the designated location before the quotation deadline. All late quotation documents will be rejected and returned unopened. Except for special reasons, the quoting party should notify the inquiring party and the inquiring agency before the quotation deadline and obtain their consent. 9.6 Supplement, Modification, and Withdrawal of Quotation Document
1 Before the quotation deadline, the quoting party may submit a written supplementary quotation document to the inquiring party, modify or replace the quotation document already submitted (or sent).
2 The supplementary quotation document must be signed by the legal representative (or authorized agent) who signed the quotation document and stamped with the company seal.
3 Any supplementary quotation document received by the inquiring party before the quotation deadline and complying with the provisions of this inquiry document shall be part of the quotation document and shall have legal effect. In case of discrepancies between documents, the later dated document shall prevail.
Complete version of the inquiry document