2023 Annual Maintenance Inquiry Document for High-Voltage Equipment


Publish time:

2023-10-12

2023 Annual Maintenance Inquiry Document for High-Voltage Equipment
  1. Purpose

To ensure the long-term stable operation of Huidongwei's power supply and distribution, the maintenance and upkeep of the Huidongwei-owned Lianghua to Shiwuliao dedicated power transmission line—the entire high-voltage line from the main grid to the client, with a total length of 5 kilometers, 63 poles, and LGJ-150/20 conductors—is addressed;

Work shall be carried out strictly in accordance with the latest high-voltage electrical equipment testing procedures, requirements, and methods;

  1. Construction Workload and Technical Requirements

2.1 Ensure normal power supply. The number of power outages due to inadequate maintenance and untimely vegetation clearing should not exceed three times per year; in case of abnormal power outages (e.g., due to other line tripping or accidents), 2 hours to arrive on-site and resolve the issue without compromising safety, restoring normal power supply;

2.2 Regularly inspect and patrol the power lines. Any identified hidden dangers should be promptly addressed and reported to our company. If the power supply department discovers faults or safety hazards during patrols and inspections, leading to forced power outages, the contractor should arrive on-site within 2 hours to handle the fault and coordinate with the power supply department to restore power;

2.3 Patrol and inspection content includes: ① Towers; ② Crossarms and hardware; ③ Conductors; ④ Lightning protection facilities; ⑤ Grounding devices; ⑥ Service lines; ⑦ Guy wires, top (support) poles, guy wire posts; ⑧ Insulator strings; ⑨ Along-line conditions; Specific maintenance and inspection content is shown in the attachment.

2.4 Handle vegetation clearing along the high-voltage line, resolve disputes with local villagers, and coordinate with local villagers on vegetation clearing compensation. Compensation for saplings will be determined based on the following situations:

2.4.1 Dongpeng Line 20# Ganlianghua Line and Client T The compensation for saplings within the line section from the type tap-off point to the client's mountainside dormitory eucalyptus forest (including the eucalyptus forest) shall be borne entirely by the contractor;

2.4.2 Client's eucalyptus forest (excluding the eucalyptus forest) to the client's 10KV terminal pole line section. The land ownership of this line section currently belongs to the Lianghua Town collective ownership, which was changed to individual ownership in 2010 year. The client should fully assist the contractor in coordinating with the Lianghua Town government and villagers to handle the sapling compensation for this line section. If this cannot be coordinated and implemented, 1000 yuan (including 1000 yuan) of sapling compensation shall be resolved by the contractor, 1000 yuan or more of sapling compensation shall be paid by the contractor 1000 yuan, with the exceeding amount paid by the client; when paying this amount to the villagers, the relevant person in charge of the client must be present, and the villagers must provide relevant receipts, along with photos and a detailed list of the saplings. 。

(Note: The above-mentioned amounts only refer to the compensation for saplings paid to the villagers and do not include any other expenses incurred during vegetation clearing.)

2.5 Ensure maintenance, repair, and fault elimination. The contractor guarantees regular patrols (no less than once a month) of the power supply and distribution equipment operation status, promptly organizes repairs for any discovered faults or anomalies. For repair material costs of 300 yuan or less, the contractor shall pay in advance without reporting to the client for payment, but the contractor needs to keep relevant repair records;

2.6 Conduct preventive tests on high and low voltage electrical equipment according to power standards. Conduct regular preventive tests on high and low voltage equipment according to relevant national power regulations and standards, and generate formal inspection reports for the client's filing.

2.7 Regularly verify relay protection and automatic devices according to regulations. Regularly conduct verification tests on on-site relay protection and automatic devices according to relevant standards, and submit the test results in a formal written report to the client for filing.

 2.8 Collect real-time data on equipment load operation, master the detailed real-time situation of reactive power compensation, analyze the nature of the load and the compensation effect, improve equipment compensation efficiency, reduce equipment loss, improve load utilization rate, and maximize resource and energy savings.

2.A When voltage quality problems occur in the power supply and distribution equipment circuit (overvoltage, undervoltage, overcurrent, undercurrent, overfrequency, underfrequency, low power factor, excessive harmonic current and voltage, etc.), an audible and visual alarm will be triggered, promptly reminding the on-site duty personnel to check the equipment status, providing a basis for promptly troubleshooting equipment faults, ensuring safe equipment operation, and promptly feeding back the monitoring situation to the client.

2.B The contractor's maintenance personnel need to have on-site emergency handling of accidents such as circuit breaker tripping, discovered defects, and anomalies during operation, as well as power supply and distribution capabilities for people's livelihood. At the same time, the contractor should promptly report to the client's designated full-time person in charge and record it in the patrol records and relevant logbooks.

2.C Master the operating status of the line and the environmental conditions along the line, and carry out line protection publicity work; give priority to assisting the client in handling other maintenance, repair, and line equipment modification matters related to the power supply system arranged by the client;

2.D Annual testing and performance tests of vacuum circuit breakers, lightning arresters, grounding grids, 10KV power transmission lines 2 times, and insulator insulation performance tests 24 times, and submit valid test reports and maintenance plans.

 

 

  1. Work Interface Division
    1. The owner is responsible for providing :
  1. Temporary power supply for construction;
  2. Required distribution drawings;
  3. Required cable list;
  4. Provide coordination and management work for the construction of this project;
    1. Contractor's Including, but not limited to:
  1. The contractor must have the necessary qualifications for high-voltage equipment maintenance and inspection, and special equipment installation, transformation, and maintenance licenses;
  2. Actual on-site professional and technical personnel and special equipment operators, maintenance personnel configuration, emergency response time limit 2 hours;
  3. The contractor shall be responsible for fulfilling statutory licensing procedures, inspections, cleaning, maintenance, regular maintenance and repair (excluding major repairs and renovations), replacement of wearing parts, regular issuance of inspection reports, participation in emergency rescue drills, and guidance and training of users on safe use;
  4. Provide special operation certificates and suitable for PPE and unified work uniforms;
  5. Comply with the National Safety Production Law, and the safety operating procedures of the electrical and power industry.
    1. Other matters not covered herein shall be jointly negotiated by both parties.
  1.   Construction Technology and Quality Requirements
    1. Standard Requirements:
  1. 《电力变压器》GB/T1094.1-2013
  2. 《施工现场临时用电安全技术规范》JGJ46-2005
  3. 《电气装置安装工程电气设备交接试验标准》GB50150-2016
  4. 《电力变压器检修导则》DL/T573-2010
  5. 《高电压试验技术》GB/T16927.2-2013
  6. 《现场绝缘试验实施导则》DL/T474.2-2006
  7. 《输变电设备状态检修试验规程》Q/GDW1168-2013
  8. 《油浸式变压器状态评价导则》DL/T 1684-201
  9. 《 电力设备预防性试验规程 》
  1. Construction Equipment Requirements

All testing equipment provided by the contractor must be inspection qualified and within the valid period of use. Those requiring calibration or regular inspection must provide calibration and inspection certificates. The specifications and parameters of the equipment must meet testing equipment requirements. Before use, they must be confirmed and relevant equipment-related qualification certificates must be submitted; If the owner finds that the contractor's testing equipment and tools affect the project progress or construction quality, the owner has the right to require the contractor to add or replace testing equipment and tools them. The contractor shall bear the responsibility for any additional costs and delays caused thereby.

  1. Construction Manpower Requirements

  To meet the basic requirements for construction personnel, the professional personnel of the construction team include, but are not limited to:

Serial Number

Type of Work

Qualification Requirements

Remarks

1

Site Manager

Safety C certificate, red safety helmet

 Part-time safety officer

2

Electrician

High-voltage electrician access permit

 

 

  1. Schedule Requirements
    1. 2023 Annual maintenance contract ;
  2. Safety Requirements
    1. Implement the health, safety and environmental management system, regulations and project safety management regulations of Huizhou Dongjiang Veolia Environmental Service Co., Ltd.;
    2. A project health, safety and environmental management system must be established and submitted to the owner before entering the site for work;
    3. A dedicated safety officer shall be set up at the construction site for real-time monitoring and management, and the safety reports and materials required by the owner shall be submitted on time;
    4. At the pre-shift meeting, the foreman shall conduct a safety technical briefing on the construction project and keep a record of the safety briefing content;
    5. The construction team must actively participate in the safety meetings and training organized by the owner (such as project safety weekly meetings, monthly safety meetings).
    6. When conducting hazardous operations, the work permit system must be implemented (application for hazardous operation permits, such as hot work, high-altitude operations, etc.), and risk analysis and appropriate protective measures must be taken;
    7. Before the construction operation, the foreman shall check the personnel, equipment, tools, safety protective equipment and construction safety plan, etc.;
    8. The construction team's safety supervision and safety officers shall conduct self-inspections every day, rectify any hidden dangers found, and keep relevant records;
    9. Operators should be proficient in first aid, fire fighting, self-rescue and escape safety knowledge and skills;
    10. The contractor shall be solely responsible for all expenses incurred by the contractor's personnel during service to the owner due to illness, work-related injuries, accidents, disease transmission, labor protection, occupational diseases, etc.
    11. Regardless of whether the inspection is passed by the Party A, the Contractor shall not be exempted from any liability for materials, equipment or construction. Except
  3. Changes
    1. Changes arising during construction shall be confirmed by the owner in terms of workload, and the cost shall be settled after project completion;
    2. The calculation of change costs shall be based on the contract-agreed labor, equipment, and material consumption rates.
  4. Completion Confirmation

After completion of construction, the project must pass the owner's quality inspection and completion confirmation before it can be considered completed. The owner has the right to comprehensively assess the contractor's construction progress, quality, HSE and has the right to take economic measures for unqualified items. Before completion, the contractor is responsible for construction according to design changes, rectification as required, and product protection, etc. The contractor shall provide quality follow-up service during the warranty period.      

 

Complete tender document download

Tags: