2023 Anjia Tai Air Conditioning Maintenance Inquiry Document
Publish time:
2023-05-18
I. Procurement Project: 2023 Year Anjiatai Air Conditioning Maintenance
II. Maintenance List and Air Conditioning Accessories List
1. Anjiatai Air Conditioning Maintenance List:
A total of 13 Anjiatai one-to-one split air conditioners, 4 ceiling-mounted units; The maintenance period repair scope includes: free labor costs, including accessories within the unit price of 100 yuan (excluding copper pipes, air conditioner disassembly and installation, and refrigerant).
2. Air Conditioning Maintenance Accessories List: The following accessories may be 1 to 5 HP air conditioner accessories.
III. Maintenance and Maintenance Content
Part 1: PFS Maintenance Work Content
A Preparation and inspection before startup during operation Before operation in the cooling season, the following checks and preparations must be carried out to ensure reliable, safe, and efficient operation of the unit:
1. Check refrigerant level and oil level;
2. Check oil sump, oil heater, and oil temperature;
3. Check and test all operating and safety control functions;
4. Review operating procedures with operators and check unit history records;
5. Check the operation of the starter;
6. Cooperate to check the operation of the water system (including chilled water pumps, water flow switches, valves, etc.);
7. Check and adjust the set values of the microcomputer control center;
8. Start the unit, check the operation of the entire system, and record the unit operating parameters;
9. Analyze and process unit problems based on operating records;
10. Provide maintenance and repair reports.
B Check the unit during operation, regularly (quarterly) perform the following checks to ensure that the unit operates efficiently and reliably throughout the cooling season:
1. Check the chiller and adjust the safety control device;
2. Check the operation of the control device;
3. Check oil level and refrigerant level;
4. Check the lubrication system;
5. Check the return oil system;
6. Check the operation of the motor and starter;
7. Record operating status parameters, analyze and confirm that the unit is operating normally, and repair the unit if necessary;
8. Record and report required spare parts.
C Twice-a-year equipment shutdown inspection and preventive maintenance
During shutdown, the following checks are carried out once a year to correctly evaluate the status of the equipment and prepare for the next cooling season operation:
1. Check the compressor - The following items of the motor assembly, complete the tasks of preventive maintenance:
◆ Record voltage;
◆ Measure and record the insulation resistance of the motor windings with a megohmmeter;
◆ Check and confirm the positioning of the open motor drive device;
◆ Check the sealing condition;
◆ Check the operation of the slide valve and make necessary adjustments.
2. Check the following items of the compressor lubrication oil system:
◆ Replace lubricating oil, oil filter, and desiccant filter as needed;
◆ Check the heater and thermostat;
◆ Check all other lubricating oil system components, including oil coolers, oil filters, and solenoid valves;
3. Perform the following operations to check the motor starter:
◆ Perform diagnostic check procedures;
◆ Clean or recommend replacing the contactor;
◆ Check the connecting mechanism;
◆ Check all terminals and tighten;
◆ Check the overload device and take an oil sample for calibration;
◆ Clean the oil filter and replace it if necessary;
◆ No-load operation starter (or before starting); check status indicator lights.
4. Check the control panel to determine the following:
◆ Perform diagnostic check procedures;
◆ Check the safe shutdown operation status;
◆ Check all terminals and tighten;
◆ Check the accuracy and set values of the displayed data.
5. Check the following items of the condenser and evaporator:
◆ Check water flow;
◆ Check the control of the water flow switch;
◆ Analyze the heat exchange effect based on the operating record parameters and recommend water treatment;
◆ Disassemble the end cover and replace the gasket if necessary.
6. Check the following items of the system:
◆ Perform a leak check, locate the leak, and repair it;
◆ Supplement refrigerant as required;
◆ Record the status of the sight glass;
◆ Check the refrigeration cycle and confirm that it is in a normal balance state;
7. Other:
◆ Follow the inspection and maintenance procedures to repair the detached insulation;
◆ Communicate with the operators.
Part Two Water Treatment Work Content
A Purpose of Water Treatment
The reuse of chilled and cooling water in air conditioners is to save water and electricity, which is an important part of saving resources and reducing operating costs. However, some chemical reactions or biological processes that occur during the reuse of water circulation have a corrosive effect on metal pipes and will reduce the heat exchange efficiency of condensers and evaporators, so it is necessary to treat the water quality. 程对金属管材有腐蚀作用,并且会降低冷凝器及蒸发器热交换效率,因而有必要进行水质 处理。
B Cleaning and Pre-filming Scheme for Central Air Conditioning Chilled Water Circulation System
1) Chemical Cleaning of Chilled Water System Removing sludge: According to the different conditions of cooling water and chilled water, the contractor will add bactericides, algicides, and cleaning agents to the chilled and cooling systems, respectively, and operate for a certain number of hours, discharging wastewater until the turbidity reaches a certain level. 24 hours, and discharge wastewater until the turbidity <35ppm。
2) Rust Removal Cleaning of Chilled Water System
After the above treatment, rust removal cleaning is carried out. Chemical rust removal cleaning agents, dispersants, corrosion inhibitors, etc., are added to remove sludge, loose rust, iron scale, and scale from the pipe walls and heat exchangers of the circulating system. This process takes approximately 24 hours of continuous operation, during which PH value, turbidity and total iron are monitored. Based on the monitoring results, replenishment is continuously carried out. When the above items show a downward trend, stop adding chemicals and proceed to the complete discharge stage. Completely drain the chilled water from the system's lowest point, disassemble the Y type filter, remove debris from the filter screen, discharge the turbid water, and replace it with fresh tap water. The cleaning stage is complete. 型过滤器,清除滤网杂物,排出污浊水质换入新鲜自来水,清 洗阶段完成。
3) Passivation and Pre-filming of Chilled Water System
When the water quality is close to the original water color, passivation agent and (copper, carbon steel) pre-film composite agent are added: using WP-4 improved formula, adding corrosion inhibitors and corrosion and scale inhibitors for closed-loop systems. The main purpose of this step is to strengthen the treatment of the inner metal surface of the cleaned system, forming a thin protective film on the inner metal wall to slow down the corrosion rate during future operation and reduce the formation of iron scale, scale, and rust nodules. Discharge part of the pre-film liquid to end the pre-filming. Proceed to the normal operation and maintenance stage. 铁垢、水垢、锈瘤的形成。排去部分预膜液,结束预膜。转入正常运行维护阶段。
C Daily Maintenance Plan
1 Conduct a major system cleaning twice a year to remove accumulated sludge, oil, rust, and other deposits.
2 Clean the expansion tank twice a year.
3 Disassemble and clean the type filter, remove debris from the filter screen, discharge the turbid water, and replace it with fresh tap water. The cleaning stage is complete. type filter twice a year to remove debris.
4 Take water samples from the chilled water system every quarter to measure pH value, monitor for abnormal leaks, and replenish corrosion inhibitors as needed.
5 Based on the results of bacterial count and sludge amount tests, add bactericides and algicides to control the growth of bacteria and algae.
6. Replenish corrosion and scale inhibitors to the chilled water system once per quarter.
7. During the winter shutdown period, add a wet preservation agent to prevent static water corrosion.
Service Method:
I. Central Air Conditioning
- Maintenance work content requirements, quarterly 1 times, technical personnel will be dispatched to inspect and maintain the listed equipment;
- Conduct pre-season preparation and inspection once a year for both the cooling and heating seasons;
- Conduct equipment shutdown inspection and preventive maintenance once a year for both the cooling and heating seasons.
II. Split Air Conditioner Maintenance: Clean the outdoor and indoor units once a year respectively 1 to 2 times;
IV. Fault Response Time
- After receiving a phone call from our company, the supplier must arrive at our company's office building for repair within 6 hours;
- If the air conditioner does not require replacement of parts, the supplier must restore the air conditioner to normal operation within 4 hours after arriving at the factory;
- If parts need to be replaced, the air conditioner should be restored to normal operation within one working day. If large-scale manufacturer-customized parts are involved, the air conditioner should be restored to normal operation within three days after the parts arrive from the manufacturer.
V. Quotation Document Requirements:
1 ) The quotation document prepared by the bidder should include the following content:
1 Detailed quotation table (format see Appendix 1);
2 Technical report of quoted goods (brand, specifications, technical parameters);
3 After-sales service content;
4、 Typical customers;
2 ) Quotation and Quotation Document Requirements:
1 Quotations include product transportation, guidance on installation, debugging, metrological verification, service, and taxes;
2 The quotation document must be sealed with an official stamp across the binding.
3、 The quotation document must be delivered in a sealed envelope with the bidder's seal affixed to the seal.
VI, Business Requirements:
- Contract Maintenance Period:
- Transportation Method and Freight Costs: The supplier is responsible for all costs associated with transportation to the factory.
- Delivery Location: Huizhou Dongjiang Veolia Environmental Service Co., Ltd., Address: Shiwuliao Nankeng, Lianghua Town, Huicheng District, Huizhou City
- Payment Method:
- 30% advance payment within 30 days of contract signing; 40% maintenance fee within 30 days of contract expiration; 30% maintenance fee within 30 days of contract expiration.
- For each progress payment, the party B shall provide a 13% VAT special invoice and a payment application letter for the corresponding amount, and the party A shall pay within 30 days.
- The cost of accessories will be settled and paid according to the actual number of orders placed.