Inquiry Document for the Huizhou Dongjiang Veolia渗滤液调节池 Cover Membrane Installation Project


Publish time:

2023-05-15

Inquiry Document for the Huizhou Dongjiang Veolia渗滤液调节池 Cover Membrane Installation Project

1 Definition

Enquiry party: Huizhou Dongjiang Veolia Environmental Service Co., Ltd. ;

Bidding party: Units that have passed the qualification review and meet the relevant qualification requirements of this enquiry are invited to participate in the bidding competition;

2 Enquiry Document

2.1 Composition of the Enquiry Document

2.1.1 The enquiry document consists of the enquiry document and 2 "attachments".

2.1.2 All valid written notices, modifications, and supplements made by the enquiry party are integral parts of the enquiry document.

2.1.3 The bidding party should carefully check whether the enquiry document is complete, read it carefully and comprehensively, and fully understand the entire content of the enquiry document.

2.2 Interpretation and Clarification of the Enquiry Document

2.2.1 If the bidding party finds any discrepancies in the enquiry document or has any questions or misunderstandings about its content, it should request an explanation in writing within 5 days of receiving the enquiry document. The enquiry party intends to notify all bidding parties of the explanation in the form of a supplementary enquiry document.

2.2.2 Supplementary enquiry documents issued by the enquiry party before the bidding deadline are integral parts of the enquiry document and have the same legal effect as the bidding document. In case of contradictions in the content of the documents, the document with the later date shall prevail.

2.3 Site Visit

2.3.1 The cost of the bidder's site visit shall be borne by the bidder.

2.3.2 With the permission and prior arrangement of the enquiry party, the bidder and its representatives can enter the site for inspection. However, the enquiry party shall not bear any responsibility for any activities of the bidder and its representatives during the site inspection. The bidder and its representatives shall bear all losses or expenses caused by personal injury, property loss or damage to themselves or third parties after entering the site, as well as losses or expenses caused by any other reasons.

2.4 Language of the Bid

The bidding document and the correspondence and documents between the bidder and the enquiry party relating to the bid shall be in Chinese. Supporting documents and printed materials provided by the bidder with the bidding document may be in another language, but the relevant paragraphs must be accompanied by appropriate Chinese explanations. The interpretation of the bid shall be based on the Chinese version.

3 Project Overview, Detailed Work Content, Safety Technology and Special Requirements

3.1 Project Location:

3.2 The project content and requirements are detailed in "Attachment 1".

4 Project Contracting Method

This project includes (see Attachment 1). The contract price includes all construction costs, commissioning costs, safety measures costs, profits, taxes, and all other expenses incurred in completing the project content and requirements of this contract.

5 Project Duration

The contract period for this project is from year month day to year month day.

6 Project Warranty Period

The warranty period for this project is 12 months, calculated from the date of completion of all construction and acceptance by the owner.

7 Bidder Qualifications

7.1 Qualified bidders should have the ability to fully perform the contract, and should specifically meet the following conditions:

7.1.1 The bidder must be an independent corporate legal entity of the People's Republic of China with the right to independently enter into contracts.

7.1.2 Its qualification level and business scope should meet the project requirements (if the general contracting and subcontracting of non-main projects are adopted, the bidder must provide qualification certificates and performance certificates of qualified subcontractors; if the bidder does not have general contracting qualifications, it should provide qualification certificates of qualified partners and participate in this bidding as the leader).

7.1.3 Has a sound quality assurance system.

7.1.4 Has similar landfill operation experience in the past two years, and no major construction quality problems have been found in previous construction projects, or effective improvement measures have been taken.

7.1.5 Has good bank credit and business reputation, and is not in a state of being ordered to suspend business, property being taken over, frozen, or bankrupt.

8 Bidding Document

8.1 Composition of the Bidding Document

The bidding document should be bound in the following three parts:

Part 1

I. Bid

II. Authorization Letter from the Legal Representative of the Bidder

III. Qualification and Credit Proof Documents of the Bidder (If general contracting and subcontracting of non-main projects are adopted, the bidder must provide qualification certificates and performance certificates of qualified subcontractors; if the bidder does not have general contracting qualifications, it should provide qualification certificates of qualified partners and participate in this bidding as the leader):

a. Declaration Letter on the Bidder's Qualification;

b. Business License of the Enterprise Legal Person (copy from the Industrial and Commercial Bureau), Bank Credit Certificate (original);

c. Company Profile;

d. Performance and current contracts (including completion status and major quality problems and improvement measures);

Part 2

Project Bid Sheet and Itemized Bid Sheet (General Contract Price and Itemized Bid (format see Attachment 1, Attachment 2). Itemized bid includes, but is not limited to, labor, machinery, taxes, management fees, profits and all other expenses.

Part 3

I. Difference Table (if any);

II. Construction Organization Design;

III. Project Acceptance Plan;

IV. Other issues that the bidder needs to explain.

All supplementary and revised documents to the bidding document submitted by the bidder before the bidding deadline are considered integral parts of the bidding document.

8.2 Preparation of Bidding Documents

8.2.1 General Requirements

8.2.1.1 The bidder should prepare the quotation document according to the requirements of this quotation, responding to each item and clause of the inquiry document, and the order and numbering should be consistent with the inquiry document. Explanatory or descriptive text can be added.

8.2.1.2 Differences between the quotation document and the inquiry document, even if very small, should be summarized in the "Difference Table". The inquirer will use this as a basis for deciding whether to accept or reject the quotation during the evaluation. Any content not specified in the quotation or not covered in the explanation is deemed accepted by the bidder and becomes part of the contract signed by both parties. No additional conditions may be proposed for any reason.

8.2.1.3 The quotation document confirmed by the bidder is legally binding. Any oral agreement with the inquirer's individual cannot affect any clause or content of the quotation document.

8.2.2 Bidder's Suggestions

The bidder should respond to the inquiry document and submit a quotation. In addition, supplementary suggestions or explanations can be provided, suggesting more reasonable solutions than those required in the inquiry document, listed in "Other Issues Requiring Explanation by the Bidder." The impact on technical conditions, price, and construction should also be explained. Any preferential conditions should also be stated in the quotation document and will be carefully considered by the inquirer during the evaluation.

8.2.3 Number of Copies and Signature of Quotation Document

8.2.3.1 One original and one copy of the quotation document are required. The quotation should be marked with "Original" and "Copy". In case of discrepancies between the copy and the original, the original shall prevail.

8.2.3.2 The quotation document should be signed by the legal representative (or authorized agent) of the bidder and stamped with the company seal.

8.2.3.3 Quotation documents will not be returned, regardless of whether they are ultimately adopted.

8.3 Quotation

8.3.1 The bidder should carefully fill out the "Engineering Quotation Form" in accordance with the format in "Attachment 2" of the inquiry document. The quotation form includes two parts: total contract price and itemized quotation. The itemized quotation includes three parts: equipment quotation, installation and commissioning quotation, and building and structure quotation. This quotation is a lump-sum price. The bidder should prepare the budget and quotation based on the inquiry document, engineering technical specifications, and construction drawings for this project. The quotation will not be adjusted after submission (any changes in the engineering quantity during the project implementation are included in the total contract price). The commercial quotation and technical quotation must be sealed separately in envelopes. Two copies of the quotation form are required, signed and stamped by the bidder, and sealed separately in envelopes with the company seal.

8.3.2 All quotations from the bidder shall be in RMB. All clauses in this inquiry document involving quotations should be included in the bidder's quotation. The inquirer considers the bidder's quotation to be the result of a comprehensive calculation of various costs and taxes (the tax rate should be clearly stated), and this quotation is a fixed price.

8.3.3 The bidder may adjust the total quotation before the quotation deadline. The adjustment document must be signed by the legal representative (or authorized agent) and stamped with the company seal, and submitted as a supplementary material to the quotation document (must be sealed according to the requirements).

8.4 Submission of Quotation Documents

8.4.1 Sealing and Marking of Quotation Documents

Quotation documents should be sealed separately as originals and copies, and clearly marked as "Original" or "Copy" on the envelopes. The quotation form must be sealed separately and enclosed in the original. The cover must indicate the quotation project and the name of the bidder.

8.4.2 Quotation Deadline and Location: Before 13:00 on May 22, 2023, submit/courier to "Ms. Xu, Purchasing Department, Huizhou Dongjiang Veolia Environmental Service Co., Ltd.". Quotation documents must be submitted to the designated location before the quotation deadline. All late quotation documents will be rejected and returned unopened. Except for special reasons, the bidder should notify the inquirer and the inquiry agency before the quotation deadline and obtain their consent.

8.5 Supplement, Modification, and Withdrawal of Quotation Documents

8.5.1 Before the quotation deadline, the bidder may submit a written supplementary quotation document to the inquirer, modify or replace the quotation document already submitted (or sent).

8.5.2 The supplementary quotation document must be signed by the legal representative (or authorized agent) who signed the quotation document and stamped with the company seal.

8.5.3 The supplementary quotation document must be sealed and submitted in accordance with the provisions of Clause 10.4.1. The cover of the envelope must be marked with "Supplementary Quotation Document".

8.5.4 Any supplementary quotation document received by the inquirer before the quotation deadline and complying with the provisions of this inquiry document shall be part of the quotation document and shall be legally binding. In case of discrepancies between documents, the later document shall prevail.

9.6 Invalid Quotation

Any of the following situations shall be deemed an invalid quotation:

9.6.1 The quotation is not sealed, or the quotation document is not stamped with the company seal and signed by the legal representative (or authorized agent);

9.6.2 The content of the quotation document seriously deviates from the inquiry document;

9.6.3 There are more than two quotations in the quotation document, and it is not clear which quotation is valid;

9.6.4 Other quotations that do not meet the requirements of the inquiry document.

9.7 Quotation Validity Period: 120 days (calculated from the quotation deadline).

9.8 Quotation Costs and Safety Responsibility: The bidder shall bear all costs incurred in the quotation process and shall be responsible for its own safety during the quotation activity.

9.9 Subcontracting is generally not allowed for this inquiry project. If partial subcontracting is required, the bidder should clearly state this in the quotation document.

10 Payment Method

10.1 The currency used for this project is RMB. Payment method: check/bank transfer.

10.2 Amount and Arrangement of Payment

After the completion of this project and acceptance by the owner, 90% of the total payment will be paid within calendar days. The remaining 10% will be retained as a project performance bond, which will be paid in full within working days after the warranty period expires without any quality problems.

10.3 The contractor agrees that the inquirer has the right to deduct the breach of contract penalty or compensation stipulated in this contract from the payable amount or the performance bond.

11 Method of Obtaining/Sending Inquiry/Quotation Documents:

11.1 Project Contact Person/Supervisor

Business Contact: Xu Chunhua; Email: chunhua.xu@veolia.com

Tel: 0752-8964100; Fax: 0752-8964152

Technical Contact: Peng Jinlong; Email: jinlong.peng@veolia.com

Telephone: 0752-8964100; Fax: 0752-8964152

Business Supervisor: Xin Wang; Email: xin.wang@veolia.com

Telephone: 0752-8964100; Fax: 0752-8964152

Technical Supervisor: Yujie Mao; Email: yujie.mao@veolia.com

Telephone: 0752-8964100; Fax: 0752-8964152

11.2  Quotation submission deadline: May 22, 2023, 13:00;

11.3  Quotation submission address: Please seal the quotation document with a stamp and send it via SF Express or deliver it to: Nan Keng, Shiwu Liao, Lianghua Town, Huichong County, Huizhou City, Guangdong Province, Huizhou Dongjiang Veolia Environmental Service Co., Ltd. Purchasing Department Ms. Xu 0752-8964129/8964100-8601

 

Download the complete RFQ document