2023 Phase 1 Inquiry Document for Groundwater and Soil Hidden Danger Remediation Project


Publish time:

2023-04-11

2023 Phase 1 Inquiry Document for Groundwater and Soil Hidden Danger Remediation Project

Huizhou Dongjiang Veolia Environmental Service Co., Ltd.

Procurement Purchase Inquiry Price Document

 

 

 

Project Name: 2023 Groundwater and Soil Hidden Danger Elimination Project (P01)

 

 

 

 

Huizhou Dongjiang Veolia Environmental Service Co., Ltd.

Inquiry Time: 2023 Year April 11

 

 

I. Method for Requesting/Submitting Inquiry/Quotation Documents:

1. Contact Person/Supervisor

Business Contact Person: Chen   Xiao   Can ;     Email Address: xiaocan.chen @veolia .com.

Tel       Number: 0752-89641 00;     Fax     Number: 0752-89641 52。

Technical Contact Person: Xiao   Jie ;         Email Address: jie.xiao @veolia.com 。

Tel       Number: 0752-89641 00;     Fax      Number: 0752-89641 52。

 

Business Supervisor: Xu   Chun   Hua ;    Email Address: chunhua.xu@veolia .com。

Tel       Number: 0752-89641 00;     Fax     Number: 0752-89641 52。

Technical Supervision Person: Yang   Yun   Bo ;    Email Address: yunbo.yang@veolia.com 。

Tel       Number: 0752-89641 00;     Fax      Number: 0752-89641 52。

2. Address: Shiwuliao, Lianghua Town, Huichong County, Huizhou City, Guangdong Province (Postcode: 516323) 。

3. Quotation Document Submission Deadline: Before 5 PM, April 18, 2023

4. Sealed delivery of quotation documents is required. , Seal the quotation documents with the company 。

seal 5. Composition of Quotation Documents (See Attachment 1 for detailed quotation document format)

II. Quotation Content and Requirements:

1. Groundwater and soil testing projects, etc. Quotation Table ;

2. Technical situation report related to this work ;

3. Preliminary plan or workflow for this work;

4. Quotation qualification documents (unit basic information: copy of business license, opening permit copy, brief introduction of unit basic information, personnel qualification information, laboratory qualifications and other relevant qualification certificates).

III. Summary of Commercial Terms :

1. Delivery Location: Shiwuliao, Lianghua Town, Huichong County, Huizhou City, Guangdong Province Huizhou Dongjiang Veolia Environmental Service Co., Ltd..

2. Delivery Time: Completed within 60 working days from the date of contract signing. Quality Assurance: The

3、 work carried out must fully comply with the quality standards agreed upon by both parties.

4、 Changes:

Within the validity period of the quotation, if the carried out work cannot be provided due to the supplier's ability or other reasons, Party B must use a new service of the same or higher grade, and must use a new service of the same or higher grade, all prices (unit price and total price) shall not be increased.

5、 Acceptance Method:

Acceptance standards, methods and deadline for raising objections: In accordance with the agreed quality requirements and technical standards, if the acceptance shows that the report quality, specifications or performance fail to meet the standards stipulated in this contract in any material aspect, then Party A After written notification and verification by the supplier, or other reasons, the party will pay to replace other qualified report, or the Party A will deduct the service fee according to the agreed method between both parties.

6、 Payment Method :

The actual payment method confirmed through communication shall prevail.

IV. Quotation and Quotation Document Preparation Requirements:

1、 The quotation includes this work sampling, testing report 、 taxes and other fees;

2、 Each page of the quotation document must be stamped with the bidder's seal /official seal and the document should be stamped across the binding;

3. Two copies of the quotation document (original and copy) 。

V. Invalid Quotation Documents Definition:

In any of the following circumstances, the quotation document is invalid:

1. The bidder is found to have engaged in illegal or irregular conduct that affects the fairness of the procurement process. ;

2. Due to force majeure resulting in major changes, Party A the procurement plan is cancelled.

3. The content of the quotation document does not comply with Clause IV of this inquiry document.

VI. Quotation Document Review :

Party A The review team organized by the party will review the quotation documents provided by the party based on the principles of "fairness, justice, science, and selection of the best," comprehensively considering technical indicators, price, after-sales service commitments, etc., and negotiate with the pre-selected bidders to determine the contract awardee. or other reasons, The review team organized by the party will review the quotation documents provided by the party based on the principles of "fairness, justice, science, and selection of the best," comprehensively considering technical indicators, price, after-sales service commitments, etc., and negotiate with the pre-selected bidders to determine the contract awardee.

VII. Signing Notification :

1. Before signing the supply contract, the inquirer may increase or decrease the quantity, technical standards, and scope of procurement of goods within a certain range. ;

2. After all clauses of the supply contract are agreed upon by both parties, the inquirer will arrange the signing. 。

VIII. Modification and Clarification of the Inquiry Document :

1. Three working days before the deadline for submission of quotation documents, the inquirer may modify or supplement the relevant content of the document, and send the scanned copy of the modified and supplemented content with the seal to the bidder by email. ;

2. Bidders should carefully read this inquiry document. If there are any questions, they should be sent by email to the contact person and supervisor specified in this inquiry document three working days before the deadline for submission of quotation documents (questions sent only to the contact person or supervisor are invalid, and the inquirer will not respond), and inform the contact person by telephone. The inquirer will reply by email within one working day after receiving the email or telephone notification (whichever comes later).

IX. Ordering Scope, Technical Performance and Parameters ( See Attachment 1 )

X. Number of Attachments:

   1. Attachment 1 (Technical Document);

2. Attachment 2 ( Quotation document format ).

 

Download the complete version of the inquiry document