Guangdong Provincial Hazardous Waste Comprehensive Treatment Demonstration Center Phase II Project Incineration Project Adjusted Environmental Impact Public Participation in Environmental Protection Announcement (Publication before submission for approval)
- Time of issue:2020-07-06
- Views:0
Guangdong Provincial Hazardous Waste Comprehensive Treatment Demonstration Center Phase II Project Incineration Project Adjusted Environmental Impact Public Participation in Environmental Protection Announcement (Publication before submission for approval)
- Categories:Company News
- Author:
- Origin:
- Time of issue:2020-07-06
- Views:0
Summary:
According to the requirements of the "Environmental Impact Assessment Law of the People's Republic of China", "Environmental Impact Assessment Public Participation Measures" (Ministry Order No. 4) and other documents, adjust the environmental impact report in the incineration project of the second phase of the Guangdong Provincial Hazardous Waste Comprehensive Treatment Demonstration Center Before submitting the environmental impact report to the competent department of ecological environment for approval, the full text of the environmental impact report to be submitted for approval and the public participation explanation should be made public through the network platform.
1. Construction project situation
(1) Project name: Environmental impact report on adjustment of the incineration project of the second phase of the Guangdong Provincial Hazardous Waste Comprehensive Treatment Demonstration Center
(2) Construction unit: Guangdong Anjiatai Environmental Protection Technology Co., Ltd.
(3) Construction address: Shiwuliao Forest Farm, Lianghua Town, Huidong County, Huizhou City, Guangdong Province (location at 114°37′ east longitude, 23°05′ north latitude)
(4) Construction content
The incineration project of the second phase of the adjustment has been approved by the EIA adjustment. The specific content is as follows: adjust the disposal volume of the approved categories of the EIA, increase the category from 12 to 25 (the adjusted categories are as follows: HW02 medical waste, HW03 waste Drugs, pharmaceuticals, HW04 pesticide waste, HW06 waste organic solvent, HW07 heat treatment cyanide waste, HW08 waste mineral oil, HW09 emulsion, HW11 distillation residue, HW12 paint waste, HW13 organic resin waste, HW16 photosensitive material waste, HW17 surface treatment Waste, HW18 incineration residue, HW21 chromium-containing waste, HW33 inorganic cyanide waste, HW34 waste acid, HW35 waste alkali, HW37 organic phosphorus compound waste, HW38 organic cyanide waste, HW39 phenol waste, HW40 ether waste, HW45 content Organic halide waste, HW48 non-ferrous metal smelting waste, HW49 other waste, HW50 spent catalyst, 25 types in total), the daily disposal volume remains unchanged (100t/d), the annual operating time is adjusted from 300 days to 330 days, so it is disposed of The volume will be increased by 3000t, and the total scale will reach 33000t/a; the collection and storage of mercury-containing waste HW29 (900-023-29) will be added, the construction of the second-phase wastewater treatment workshop and comprehensive building will be cancelled, and the rest will remain unchanged. The total investment of this adjustment project is about 234.54 million yuan, of which environmental protection investment is about 36.46 million yuan.
2. Disclosure of the following information
"Guangdong Hazardous Waste Comprehensive Treatment Demonstration Center Phase II Project Incineration Project Adjustment Environmental Impact Report" and "Guangdong Province Hazardous Waste Comprehensive Treatment Demonstration Center Phase II Project Incineration Project Adjustment Environmental Impact Assessment Public Participation Explanation", see the attachment.
Public scope for soliciting opinions: units and individuals directly or indirectly affected by this adjustment project, as well as units and individuals concerned about the construction of the project.
Public opinion form, see attachment.
The public can submit the completed public opinion form to the construction unit within the specified time by letter, fax, e-mail or other methods provided by the construction unit to reflect opinions and suggestions related to the environmental impact of the construction project.
When the public submits their opinions, they should provide effective contact information.
Guangdong Anjiatai Environmental Protection Technology Co., Ltd.
July 6, 2020